Don’t get me wrong. I still haven’t found a more wretched hive of scum and villainy than the GOP. It’s more likely that Lockheed Martin, Boeing, Raytheon, General Dynamics, Airbus, et. al. reminded then who’s writing the checks to PACs.
The Artemis program infrastructure is mostly stuff advanced by Obama and Biden era Congresses and Administrations.
The loop is a well precedented procedure for testing components that have not been used for a mission before. They did the same for the Apollo program.
No apology necessary. What you said is exactly what Trump was trying to do. I believe turning NASA into an air circus is exactly the plan. I hope that plan fails.
https://www.commerce.senate.gov/press/dem/release/science-survives-existential-threat-from-trump-budget-as-senate-rejects-gutting-nasa-nsf-nist/
https://www.congress.gov/crs-product/R43419
https://ourplnt.com/budget-of-nasa-year-by-year/
Don’t get me wrong. I still haven’t found a more wretched hive of scum and villainy than the GOP. It’s more likely that Lockheed Martin, Boeing, Raytheon, General Dynamics, Airbus, et. al. reminded then who’s writing the checks to PACs.
https://en.wikipedia.org/wiki/Artemis_program
The Artemis program infrastructure is mostly stuff advanced by Obama and Biden era Congresses and Administrations.
The loop is a well precedented procedure for testing components that have not been used for a mission before. They did the same for the Apollo program.
My apologies, I was unaware that the original 24% cut was eventually rejected.
No apology necessary. What you said is exactly what Trump was trying to do. I believe turning NASA into an air circus is exactly the plan. I hope that plan fails.